Amass AS150 7mm Anti Spark Connector Plug fr RC FPV Power Supply
Almost all FPV are using 12S even more
Li-po battery for Power System.the most annoying problems is the Sparking during the connect,the sparking will damage the connector! this AS150 7mm connector from Amass will resolve the problem for you!!! Item Specification:
- 100% New
- Gold plated Surface of the connector!
- Male Φ7mm pin anti-spark design is suitable for the high voltage battery (Long time 60A,Instantaneous 90A).
- AMASS Patented Anti-Spark Design!
- Reusable Conector end design for times insert and take off from the Enclosure.
- Side
- Open for easy soldering.
- Designed for 8AWG wrie.
- Tightening ring on Female side design to prevent losse after times insert and take off.
- Material of Enclosure : Super nylon molded ( durable,Excellent flame retardant)
- Material of connector : Gold plated copper
- ID:AS150
What In Package:
- 1 x New AS150 7mm conector Red kit
- 1 x New AS150 7mm conector Black kit
Average Star Rating:
0 out of 5 (0 Ratings)
Feedback Rating for This Product
Positive (0%) |
5 Stars (0)
|
4 Stars (0)
|
3 Stars (0)
|
Neutral (0%) |
2 Stars (0)
|
1 Star (0)
|
Shipping Company |
Shipping Cost |
Estimated Delivery Time |
 |
|
3 - 7 days |
 |
|
3 - 7 days |
 |
|
5 - 14 days |
Post Air Mail |
Free Shipping |
15 - 45 days |
Return Policy |
If the product you receive is not as described or low quality, the seller promises that you may return it before order completion (when you click "Confirm Order Received" or exceed confirmation timeframe) and receive a full refund. The return shipping fee will be paid by you. Or, you can choose to keep the product and agree the refund amount directly with the seller.
N.B.: If the seller provides the "Longer Protection" service on this product, you may ask for refund up to 15 days after order completion. |
Seller Service |
On-time DeliveryIf you do not receive your purchase within 60 days, you can ask for a full refund before order completion (when you click "Confirm Order Received" or exceed confirmation timeframe). |